PE ZD Engineering Co., Ltd.
Turnkey Design-Build and C&Q. Public-project PCM. Consulting, project management, and qualification and validation for laboratories, pilot plants, and manufacturing that must hold a cleanliness grade.
Taiwan and Asia
Laboratories, Pilot Plants, Manufacturing: Design-Build, Qualification & Validation.
For biopharma, semiconductors, and hospitals. Pharmaceutical GMP practice, carried out by a Taiwan team across Asia.
Particle class · ISO 9 → ISO 7 → ISO 5
TBMC cleanroom turnkey
Projects
An ISO 7 plant: gowning, corridor, then the graded rooms. Design, engineering, and the tests sit on one drawing.
Airlock, gowning, and hand disinfection.
Each project names its own result: PIC/S GMP, TFDA, and others only when that record has them.
Demo
Temperature, humidity, and differential pressure are monitored continuously. The figures here are a demonstration, not an operating plant.
22.4°C · 48% RH · +15 Pa · Demo
ΔP alarm · Demo
Grade C −2 Pa / 00:14
Turnkey delivery, public-project controls, consulting, and qualification and validation are carried by the team that designs the facility.
Turnkey Design-Build and C&Q. Public-project PCM. Consulting, project management, and qualification and validation for laboratories, pilot plants, and manufacturing that must hold a cleanliness grade.